Selling a house with unpermitted work or code issues in Sacramento
A converted garage, an enclosed patio, a bathroom someone added in the 1990s, a backyard unit with tenants: unpermitted work is common in older Sacramento-area houses, and it surfaces at the worst time, during a buyer’s inspection. Here is how to find out what was permitted, what you have to tell a buyer, and your options for selling.
If you know about it, the buyer has to know about itThe Department of Real Estate lists room additions, structural changes and repairs made without required building permits among the material facts sellers should disclose. Selling as-is does not change that. A buyer who discovers unpermitted work later, which you knew about and kept quiet, has the kind of complaint that ends up with lawyers.
Why unpermitted work matters when you sell
Work done without a permit was never inspected, so no one can say whether the wiring, framing or plumbing behind the drywall meets code. That uncertainty affects a sale in three ways. Appraisers often cannot count unpermitted square footage as living space, which lowers the value a lender will lend against. Some lenders and insurers hesitate on houses with obvious unpermitted additions. And a careful buyer will either ask for a big price cut or want the work legalized before closing, which can mean opening walls.
None of that makes the house unsellable. It narrows the list of buyers and changes the price, and the earlier you understand the situation, the more choices you keep. If an inspector has gone further and red-tagged the house, our guide to selling a condemned house in Sacramento County covers that notice and the offices that issue it.
Step one: find out what the records show
Before deciding anything, compare what was built with what the permit file says. Inside Sacramento city limits, Community Development’s online permit search and the City Clerk’s records library let you look up past permits by address or parcel number. In the unincorporated county, including Carmichael, Fair Oaks, Antelope and North Highlands, the county’s Building Permits & Inspection Division keeps the records, and older files may take a public records request. Cities such as Citrus Heights, Elk Grove, Rancho Cordova and Folsom have their own building departments.
- Step 1
Pull the permit history
List every permit on file and what it covered, such as a re-roof, water heater or room addition.
- Step 2
Walk the house against it
Note anything built or changed that has no matching permit.
- Step 3
Decide: legalize, disclose or both
Get a contractor or designer’s view of what a retroactive permit would require.
- Step 4
Disclose in writing
Describe the work honestly on your disclosure forms, whatever route you choose.
A special case: backyard and garage units
State law now treats unpermitted accessory dwelling units more gently than other unpermitted work. According to the Department of Housing and Community Development, Government Code section 66332 bars a local agency from denying a permit for an unpermitted ADU or junior ADU built before January 1, 2020 because of building code violations, unless it finds that fixing the violation is needed to correct a substandard condition. Owners can also apply to have enforcement delayed for five years to correct a violation that is not a health and safety issue. That can make legalizing an older garage unit more realistic than it once was, though it still takes plans, fees and inspections.
This is general information, not legal advice. Talk to a real estate attorney about your disclosures and to the local building department about what a retroactive permit would involve.
Legalize, remove, or sell as it is
Every option still includes honest disclosure. They differ in cost, time and how many buyers you reach.
| Option | How it works | When it fits | The catch |
|---|---|---|---|
| Get it permitted | Apply for a permit after the fact, open what the inspector asks, and fix what fails. | The work was done well and adds real value, like a solid bedroom addition. | Plans, fees and possible demolition; the timeline is set by the building department. |
| Remove or restore | Return the space to its permitted use, such as a garage again. | The work is minor or poorly done. | You pay to undo it and lose the space. |
| List and disclose | Sell on the open market with full disclosure. | The rest of the house is in good condition. | Appraisals and lender rules can cut the price or kill a loan. |
| Sell to us as-is | We buy with the unpermitted work in place and deal with it afterward. | Legalizing would be slow, costly or uncertain. | Our price accounts for the permit work and the risk. |
Useful to gather
- The permit history printout. From the city or county, for your address.
- Any notice or citation. If code enforcement has already been out, we need to see it.
- Who did the work and when. A previous owner, a contractor or you; dates help everyone.
- Lease details for an extra unit. If someone lives in a converted garage or backyard unit.
How Insightful REI handles unpermitted work
We see converted garages and unpermitted additions often, and we price them as they are. You will not be asked to legalize, remove or repair anything before closing. We walk the house, review what you know about the work, and send a written cash offer, usually within 24 hours. No commission, no fees, and we pay the closing costs. With clear title, we can close in as little as about seven days, or on your schedule. Your job is to disclose what you know; after closing, permits and corrections are ours to handle.
When legalizing is worth itIf the unpermitted work is a well-built room that adds real value, getting it permitted and then listing can bring more than we would pay. If it is a quick fix with an inspector, do it. We will tell you which way we would go. Call (916) 507-2502.
Related situations
We buy houses with unpermitted additions and conversions in Carmichael, North Highlands and Sacramento, among other places.
- Other major repairsRoof, foundation and systems problems priced in as-is.
- A rental with an extra unitSelling with tenants in place, including in a converted space.
- Damage that needs a rebuildWhen the next step would require permits anyway.
- How a sale to us worksHow the walk-through, offer and escrow work.
Permit records differ from one local office to the next
Inside Sacramento city limits, the City Clerk says permit cards from the early 1900s through 1982 sit in its Online Records Library, and those from 1982 on are in Community Development’s permit search. The city holds no building plans from before 1955. For plans it does have, it sends certified letters to all parties, including the owner, who must agree before copies are released.
In the unincorporated county, Building Permits and Inspection works from the Building Assistance Center at 9800 Goethe Road, 916-875-5296. It has an Accela permit portal, and record requests go through NextRequest. Elk Grove has a public permit lookup map and warns that copies of plans can take up to 60 days. Rancho Cordova handles permits online and answers at 916-851-8760. Citrus Heights runs its Citizen Access Portal, but it only shows permits where you are named as a contact, so call 916-727-4760 if yours do not appear.
Sacramento has also published a checklist for older accessory units under Government Code section 66332. It lists the health and safety items, such as foundations, heating, plumbing and floor framing, that plans for a legalized unit need to address.
Where to look up permits and code rules
Start with the office for the place your house actually sits. A Sacramento mailing address can still be in the unincorporated county.
-
Building records
City of Sacramento City Clerk
See which years of permit cards are online and how to request plans.
-
Online permit search
City of Sacramento Community Development
Look up permit status and details from 1982 forward.
-
Building Permits and Inspection
Sacramento County
Search permits and request records for Carmichael, Fair Oaks, Antelope or North Highlands.
-
Look up building permits and plans
City of Elk Grove
Find permit history by address or parcel, and how to ask for plan copies.
-
Building permits
City of Citrus Heights
Get portal access and contact numbers for permit questions.
-
Substandard housing checklist for older ADUs
City of Sacramento
Check what the city wants to see for a unit built before 2020.
-
Accessory dwelling units
California Department of Housing and Community Development
Read the state’s ADU handbook before you talk to a designer.
Unpermitted work questions
Can I sell a house in California with unpermitted work?
Yes. There is no rule that work must be permitted before a sale. What you must do is disclose what you know about it. The work mainly affects your price and which buyers can get financing.
Do I have to get the work permitted before selling to you?
No. We buy with the unpermitted work in place, and dealing with the city or county afterward is our job. You only need to tell us what you know about the work.
How do I find out what was permitted on my house?
Check the building department for the city or county where the house is. The City of Sacramento offers an online permit search, and Sacramento County’s Building Permits and Inspection Division handles unincorporated areas such as Carmichael and Fair Oaks.
What about a garage or backyard unit someone is living in?
State law treats unpermitted accessory dwelling units built before January 1, 2020 more leniently: local agencies generally cannot deny a permit for one because of building code violations unless a substandard condition must be corrected. We also buy with such a unit and its occupant in place.
The city has no plans on file for my 1940s house. Does that make it unpermitted?
Not by itself. The City of Sacramento says it has no building plans from before 1955, though its permit cards go back to the early 1900s. Check the cards before assuming anything, and have a contractor or the building department look at what you find. Tell your buyer what you know and what you could not confirm.
A previous owner did the work. Do I still have to disclose it?
If you know about it, yes. The duty follows what you know, whoever swung the hammer, and you can say on the form that a prior owner did the work and that you lack permit records. If you only suspect a problem, ask a real estate attorney how to word that.
Would legalizing my garage unit in Sacramento still mean drawing plans?
Expect so. The city’s checklist for units built before January 1, 2020 asks owners to show they meet minimum health and safety standards, and it calls for plans that show items such as plumbing fixtures, room dimensions, footings and framing. The bar is the state’s minimum health and safety list, and meeting it still costs time and money. Ask the building division about your specific unit before you budget.
My house is in Citrus Heights. Why can’t I see my permits online?
Citrus Heights says its portal only displays permits where you are listed as a contact, such as the owner or the contractor. A prior owner’s permits may not appear for you. Call the Building Division at 916-727-4760 or visit 6360 Fountain Square Drive to ask how to get the history.